The Nebraska Department of Transportation (NDOT) is asking the public to share their travel experiences along a busy stretch of U.S. Highway 75 as part of a new corridor study now underway. The study focuses on approximately seven miles of US-75 between Nebraska Highway 370 (N-370) and Interstate 80 (I-80).
Residents and commuters are encouraged to take a short survey—available in English and Spanish—to provide feedback on safety, congestion, and overall travel conditions. The survey includes an interactive mapping tool that lets users pinpoint specific trouble spots or areas needing improvement. Responses will help NDOT better understand community needs and guide potential future upgrades.
The US-75 Corridor Study, expected to be completed in mid-2027, will include conceptual design work and an Environmental Assessment. The effort will identify NDOT’s preferred improvement alternative and evaluate environmental, community, and traffic impacts before moving into final design and construction.
Surveys will be accepted through December 12, 2025.
More information about the study is available at ndot.info/22953.
Take the survey here!